Project Description

Monsignor McCoy High School

This project is currently at tender stage. The mechanical work includes modification to the existing fire protection sprinkler system; all new plumbing fixtures and extensive redesign of the domestic water piping system; replacement of nine rooftop air conditioning units and redesign of the majority of the duct distribution systems; modifications to the hot water heating system to suit space modifications and replacement of heating piping with Victaulic fittings.