The project consisted of an addition to the NE2 building, located on the BCIT Burnaby campus, to house the new Biomass Education Facility and provide interconnection to the existing campus hot water system.
Our team was responsible for providing fire suppression, foundation drainage services as well as plumbing throughout. In addition to this, our experts provided heating and ventilation design for both the boiler house and chipper building.
The new Biomass Education Facility and connected heating system will provide a more sustainable way of teaching students about sustainability.