təməsew’txʷ Aquatic and Community Centre

OWNER/DEVELOPER:

City of New Westminster

SECTOR:

Recreation + Community

AME ROLE:

AME360, Commissioning, Energy + Sustainability, Fire Suppression Design, Mechanical Design

ARCHITECT:

hmca

Completed:

2024

Location:

New Westminster, BC

PROJECT HIGHLIGHTS

Introducing Canada’s first net-zero carbon aquatic facility! təməsew̓txʷ Aquatic and Community Centre is a testament to innovation and eco-conscious design, setting a new standard in building performance and environmental responsibility in what is typically an energy-intensive sector.

At the core of this facility is a state-of-the-art 10-lane, 50-metre competitive pool, complete with spectator seating. Complementing this are a leisure pool, sauna and steam rooms, adult and family hot pools, a fitness centre, gymnasium, daycare, and change facilities — each thoughtfully designed to enhance community engagement and wellness.

Central to achieving its net-zero carbon status is the facility’s cutting-edge mechanical design. The facility employs an advanced gravity-fed pool filtration system (inBlue), which improves water and air quality in the natatorium. This system is being used in Canada for the first time after its success in Europe. An inBlue system significantly enhances the quality of the natatorium’s water and air, ensuring the best user experience.

The energy strategy features the harmonious operation of air source and water-to-water heat pumps, which capitalize on heat recovery from the dehumidification and ventilation processes within the natatorium. Photovoltaic panels, integral to the facility’s design, optimize the roof’s solar exposure, while the building envelope is engineered to minimize thermal bridging and maximize airtightness.

The construction phase posed its own challenges, as it required strategic planning around existing community amenities to ensure uninterrupted use throughout the multi-phase build. Despite these logistical hurdles, the project progressed with precision, preserving the community’s access to recreational resources.

Opening to the public in May 2024, this facility quickly became the heart of it’s community.

Image credit: Nic Lehoux