by Agencywebdev | May 7, 2026
Park Place at 666 Burrard Street involved the replacement of aging cooling towers in a fully operational office building. The project required continuous HVAC performance throughout the retrofit while addressing long-standing operational issues and modernizing control...
by Louise McKenzie | Feb 12, 2026
AME led a comprehensive fuel system upgrade at the Campbell River Airport. The scope included expanding the existing Jet A-1 fuel storage system, installing a new fleet fuel storage and dispensing system on the airside, and designing a jet fuel dispensing system with...
by Louise McKenzie | Jun 2, 2025
AME provided Prime, Mechanical, and Commissioning services for the Chiller Plant Retrofit and Cooling Tower Replacement at the Vancouver Public Library Central Library. The project began with AME conducting an analysis of energy use and budget for various replacement...
by Agencywebdev | Apr 2, 2025
The Masters Academy Ventilation Upgrades project in Calgary, AB, aimed to improve the building’s HVAC systems to meet new ventilation codes for classrooms. The 32,000 sq.ft. educational facility required extensive modifications to its existing systems to enhance...
by Agencywebdev | Mar 25, 2025
The City of Vancouver’s New Continental Residence, a 15-storey senior supportive residential building at 1067 Seymour St, underwent a domestic hot water (DHW) retrofit and building re-pipe. This consisted of decoupling the domestic hot water system from the building’s...
Recent Comments